Skip to content
Home » ADU Construction » How ADU Construction Works

How ADU Construction Works

How ADU Construction Works: Foundation to Handoff

Licensed ADU contractor · Snohomish County and North King County

This page walks through what actually happens when we build a backyard unit, from the first lot review to the day you get the keys.

ADU interior build-out with custom arched doorway by Artbrick in Snohomish County

Licensed. Bonded. Insured.

Your home is in safe hands.

L&I Verified

Washington State L&I verified for your protection.

7 Years Experience

Serving Snohomish and North King County since 2019.

What the build covers

ADU construction with us is design-build: one team carries the project from feasibility to handoff, for detached and attached units as your lot and local code allow. Before any digging, we go over setbacks, utility tie-ins and design review with you.

We help prepare the permit application and answer plan-review comments. We cannot promise approval timelines or rental income.

Detached ADUs Permits handling Design-build Utility tie-in Interior finish Feasibility review
Permits handling and clear design-build scope — before ground breaks on your lot.
ADU concrete stem wall foundation with gravel base by Artbrick

ADU stem wall foundation — Snohomish County

Project Types

ADU Projects We Handle

From detached backyard cottages to garage conversions and in-law units — scoped clearly for homeowners adding living space in permit-ready jurisdictions across Snohomish County, North King County, and Seattle.

Detached ADUs (DADU)

Backyard cottages with foundation, framing, MEP rough-in, and exterior shell — utility tie-ins and fire separation documented in scope.

Attached ADUs

In-law units and attached accessory dwellings where lot layout and separation requirements allow — feasibility confirmed before design work.

Garage & Basement ADUs

Conversions of existing garage or basement space where jurisdiction rules and egress allow — structural and moisture conditions assessed honestly upfront.

Interior Finish & Millwork

Drywall, flooring, trim, kitchen, bath, and custom millwork inside the ADU — same finish standards as our remodel wing.

Backyard ADU excavation with soil piles by Artbrick in Snohomish County
Site excavation
Mini excavator at ADU foundation site by Artbrick
Foundation prep
ADU foundation footprint excavation by Artbrick
Footprint layout
ADU foundation trench and formwork by Artbrick
Trench work
ADU concrete stem wall foundation with gravel base by Artbrick
Stem wall pour
ADU foundation with gravel base and anchor bolts by Artbrick
Gravel base
ADU foundation walls with anchor bolts by Artbrick
Anchor bolts
ADU foundation with utility stub-outs by Artbrick
Utility rough-in

Recent Work

Foundations in progress

Accessory dwelling unit projects across Snohomish County, North King County, and Seattle.

Our Process

ADU Build Sequence, Phase by Phase

Three phases, with scope and permit path agreed before work starts.

Site Check & Permit Set

We review your lot, setbacks, utility access and local rules, then help with the application and plan-review back-and-forth.

Foundation, Framing & Shell

Foundation, framing, MEP rough-in, and exterior shell run with inspectable milestones. Interior finish follows the same standards as our remodel wing.

Interior Finish & Final Inspection

Interior doors, trim, fixtures, paint, and punch-list walkthrough. The ADU is ready for occupancy at handoff.

Scope is written down before the excavator shows up.

Why homeowners choose Artbrick

Artbrick LLC is a licensed Washington State contractor based in Granite Falls — bonded, insured, and L&I verified (License ARTBRL*812B8). We run foundation, framing, rough-ins and inspections as one schedule, so the build doesn’t stall between phases.

  • Permit application support in scope
  • Design-build from feasibility to finish
  • Interior finish quality matching remodel wing
  • Jurisdiction-honest feasibility review
  • Licensed general contractor

See more completed work on our portfolio.

What’s included

A typical scope. Site-specific requirements and jurisdiction fees are listed separately in your proposal.

  • Feasibility review
  • Permit application support
  • Foundation and framing
  • MEP rough-in coordination
  • Exterior shell
  • Interior drywall and finish
  • Kitchen and bath finish as scoped
  • Punch-list walkthrough

Related remodel services

Where We Work

Where we build

Based in Granite Falls, we build in Snohomish County and North King County wherever local code allows ADUs.

Snohomish County

Everett · Lynnwood · Edmonds · Mill Creek · Granite Falls · Lake Stevens · Marysville · Mukilteo · Bothell

North King County

Shoreline · Kirkland · Redmond · Woodinville · Kenmore · Bothell · Seattle (north)

ADU feasibility depends on your lot and local codes. Contact us with your address and we will confirm whether your project is a fit.

City ADU pages

Dedicated ADU pages: Granite Falls · Everett · Marysville · Lake Stevens · Arlington. We also review lots in Seattle, Mill Creek, Lynnwood, Edmonds, Shoreline, Kirkland, and surrounding communities where jurisdiction rules allow. Feasibility is confirmed before design work begins.

Build Questions

Frequently Asked Questions

Service-specific questions about ADU types, construction scope, timelines, and getting a quote.

What types of ADUs do you build?

We build detached backyard cottages (DADUs), attached in-law units, and garage or basement conversions where jurisdiction rules and lot layout allow. Feasibility is confirmed before design work — not every lot fits every ADU type.

What is in a typical build scope?

Feasibility review, permit application support, foundation, framing, MEP rough-in coordination, exterior shell and interior finish, as written in your proposal. Jurisdiction fees and site-specific engineering are listed separately.

Do you build the foundation and exterior shell?

Yes. Foundation, framing, and exterior shell run with inspectable milestones before interior finish begins. Drainage, utility tie-ins, and fire separation requirements are documented in scope for your lot.

Can you finish the interior kitchen and bathroom?

Yes. Drywall, flooring, trim, kitchen, and bath finish are part of our design-build scope when included in your proposal — same finish standards as our remodel wing.

How long does the build take after permits?

Construction duration depends on size, foundation type, weather, and inspection schedules. We communicate milestones as work progresses; we do not publish fixed timelines because every lot and jurisdiction differs.

Do you work from architect plans I already have?

Yes. If you already have plans from an architect or designer, we can review them for buildability and handle permits coordination as a separate conversation. Design-build from scratch is also available where we are the builder of record.

What happens during the feasibility review?

We review your parcel map, setbacks, utility access, existing structures, and local ADU ordinance. You receive an honest assessment of what is likely feasible before design work or permit applications begin.

How do I get a quote?

Use our contact form or call (425) 422-5947. Share your address, ADU goals, and any existing plans — we follow up after feasibility review with a written proposal.

Planning an ADU?

Share your address, ADU goals, and rough timeline — we will follow up to discuss feasibility.

(425) 422-5947

Request a quote →

A backyard ADU starts with an honest feasibility review — not a sales pitch.

Get Started

Ask about your ADU build

Share your address, ADU goals, and rough timeline. We will follow up to discuss feasibility and permits.